Texas A&M University Combined Heat and Power Upgrades

Project Location: College Station, TX

Date Completed: December 2011

Owner: Texas A&M University

Architect: Jacobs Engineering Group

Description:

The project included the installation of a 34 MW aeroderivative GE LM2500+G4 gas turbine generator, a 200,000 pound per hour heat recovery steam generator (HRSG), a 11 MW back-pressure steam turbine generator, a 30,000 pound per hour boiler, control room renovations, installation of pressure reducing stations, and the associated balance of plant auxiliary equipment. In addition, the project consisted on installing approximately two miles of 4-foot by 6-foot electrical and communication duct banks through the heart of campus via open trenching and directional boring. All work was closely coordinated with the University to minimize impact to the campus.  

Client Testimonial:

HCB has provided the experience and expertise necessary to manage and construct a very complex network of electrical duct bank through some of the most congested areas of the Texas A&M University campus, including on-site construction administration to keep the project on schedule and within budget."

James G. Riley
Director for Utilities and Energy Management
Texas A&M University

 

Error loading Razor Script

Houston, Texas (Corp HQ)

3630 Westchase
P.O. Box 42008
Houston, TX 77242-2008
Phone: (713) 783-8710 
Fax: (713) 783-5313
Email: Contact Us

Austin, Texas

8107 Springdale Road
Suite 105
Austin, TX 78724
Phone: (512) 928-9300 
Fax: (512) 928-9331
Email: Contact Us

San Antonio, Texas

4726 Shavano Oak
Suite 101

San Antonio, TX 78248
Phone: (210) 248-9423 
Fax: (210) 248-9464
Email: Contact Us

Washington, D.C.

6710A Rockledge Drive
Suite 430
Bethesda, MD 20817
Phone: (301) 519-2288 
Fax: (301) 519-9677
Email: Contact Us